Tesla Battery Atlas

Stationary storage · Generation 1

Megapack 3 8-hour

8-hour Tesla-standard row on the 29 June 2026 Megablock datasheet: 603 kW and 4,824 kWh AC. Not stored as gross capacity.

UndisclosedFormat unknownUnknown – end not documented
Gross capacity
Unknown
Usable capacity
Unknown
Cells
Unknown
Pack mass
Unknown

Pack · top view

Module layout unverified

Cell supplier
Undisclosed
Cell
Unknown
Vehicles
Megapack 3
Built at
Not documented

About this pack

The 8-hour Tesla-standard row is 603 kW AC, 4,824 kWh, inverter power 798 kVA and round-trip efficiency 92.5%, with module options BM01 and BM02.

The datasheet's module-option table does not give a separate 8-hour maximum. Megablock itself is two or more of these Megapack 3 units with a medium-voltage assembly. The sheet states no energy for the block.

Tesla's Q2 2026 update says Megapack 3 and Megablock were on track to begin production in 2026 at Megafactory Texas. The Q3 update says that factory has begun production and does not name the product, so no plant is assigned. Cell format and cathode are still not stated.

Specifications

Pack data, value by value

  • Manufacturer-confirmed
  • Documented
  • Community-reported
  • Estimated
  • Verified
  • Partly verified
  • Unverified
  • Contradicted

Every value shows its evidence level, whether we have checked it against a source we read directly, and its sources. “Unknown” means no source we trust has published it. We never fill gaps with assumptions.

Gross capacityTotal energy incl. bottom buffer
Unknown

The datasheet lists this 8-hour row as 603 kW and 4,824 kWh of nominal energy at 25°C. That AC energy is not stored as gross or usable capacity.

Usable capacityEnergy available 100% → 0%
Unknown
Chemistry
Unknown

The 29 June 2026 datasheet does not name a cathode.

Cell format
Unknown
Cell supplier
Unknown
Cell count
Unknown
ConfigurationSeries × parallel
Unknown
Modules
Unknown
Nominal voltage
Unknown
Architecture
Unknown

480 V AC, 3-phase, on the datasheet. Not a DC pack voltage.

Pack mass
Unknown

Shipping weight for Tesla-standard configurations is 39,010 kg. Not stored as pack mass.

Energy densityPack level
Unknown

Requires both pack mass and capacity.

Structural pack
Unknown
Peak DC charging
Unknown

The cell

Unknown

No source read for this pack identifies the cell format, dimensions or capacity. A series/parallel layout is listed under specifications only when a source states one.

Capacity in context

Gross capacity of every documented pack. Hatched bars are disputed ranges; packs with unknown capacity are omitted.

  1. Cybertruck 4680123
  2. Model S/X 100103
  3. Model S/X 2021+100
  4. Model S/X 9090
  5. LG 5N88.2
  6. Model S 8585
  7. LG 5M84.7
  8. Panasonic 3L82.1
  9. Roadster 3.0 (R80)80
  10. Tesla 8L79
  11. LG 5L78.8
  12. Panasonic 377.8
  13. Model S/X 7575
  14. LG 5C74.5
  15. Panasonic 72 kWh72
  16. Model S 7070
  17. Tesla 4680 Structural (Model Y)69
  18. CATL 6M62.5
  19. Model 3 Mid Range62
  20. Model S 6060
  21. CATL 6L60
  22. BYD 7C55–60 (disputed)
  23. CATL 6C55
  24. Panasonic 1L55
  25. Model 3 Standard Range54
  26. Roadster ESS53
  27. Panasonic 1C52.5
  28. Powerwall 214

Applications

Where this pack is installed

Each row is a documented link between this pack and a vehicle variant, with its factory, period and evidence. A variant may also appear with other packs.

VariantPeriodFactoryMarketCodeEvidence & check
8-hourMegapack 3Unknown – end not documentedNot documentedNot market-specific—
[1]

Datasheet row only. No plant is named.

Performance

Charging, advantages and tradeoffs

Peak DC charging

Unknown

No verified charging curve for this pack is in the database yet. Curves vary with temperature, state of charge and software, so we only publish curves backed by repeatable measurements.

Advantages

None documented with a source yet.

Tradeoffs

None documented with a source yet.

Identification

How to tell if your car has it

  • Megablock datasheet Rev 1.7, 29 June 2026. 8-hour Tesla-standard row.
  • The part number on the high-voltage battery label and Tesla service records are definitive. A VIN alone does not encode the cell supplier or pack code.

History

Lineage in the Stationary storage family

Home and utility batteries. Cell format and cathode are recorded only when a source names them. Several products are sold in more than one energy configuration, so each published configuration is its own pack.

  1. Megapack 2 2-hourUnknown · Unknown
  2. Megapack 2 2-hour CMAUnknown · Unknown
  3. Megapack 2 4-hourUnknown · Unknown
  4. Megapack 2 XL 2-hourUnknown · Unknown
  5. Megapack 2 XL 4-hourUnknown · Unknown
  6. Megapack 2-hour lightUnknown · Unknown
  7. Megapack 2-hour standardUnknown · Unknown
  8. Megapack 3 2-hourUnknown · Unknown
  9. Megapack 3 4-hourUnknown · Unknown
  10. Megapack 3 8-hourUnknown · Unknown
  11. Megapack 4-hour lightUnknown · Unknown
  12. Megapack 4-hour standardUnknown · Unknown
  13. Powerwall 12015–? · Unknown
  14. Powerwall 22017–? · 14 kWh
  15. Powerwall 32023–now · Unknown
  16. Powerwall 3 ExpansionUnknown · Unknown
  17. Powerwall 3PUnknown · Unknown
  18. Powerwall+2021–? · Unknown

Sources

4 references

  1. [1]
    Megablock datasheet, Rev 1.7 (29 June 2026)

    Tesla, Inc.officialPublished 29 Jun 2026Read directly 22 Nov 2026

    Read 2026-11-14. Header: Megablock datasheet Rev. 1.7, 29 June 2026, copyright Tesla, Inc. Megablock is two or more Megapack 3 units plus a medium-voltage assembly. Tesla-standard Megapack 3 rows, nominal energy at 25°C: 2-hour 2,186 kW and 4,372 kWh; 4-hour 1,206 kW and 4,826 kWh; 8-hour 603 kW and 4,824 kWh. Shipping weight 39,010 kg for those configurations. Part 3100000-XX-Y. The sheet does not name a cathode or a cell format, and it does not state a Megablock energy total.

  2. [2]
    Tesla unveils new generation of utility-scale batteries

    pv magazinepressPublished 9 Sep 2025Read directly 22 Nov 2026

    Says Megapack 2 XL began shipping in 2022 at 3.9 MWh, and describes Megapack 3 as approximately 5 MWh. The approximate Megapack 3 figure is not recorded as a pack.

  3. [3]
    Q2 2026 Update

    Tesla, Inc.officialPublished 22 Jul 2026Read directly 24 Nov 2026

    Re-read 2026-11-24. Shareholder update for the 22 July 2026 call. "Powerwall 3P (three-phase) is now available in Germany" and the sentence does not state an energy. Megapack 3 and Megablock were "on track to begin production" in 2026 at Megafactory Texas. The capacity table lists Nevada Tesla Semi as commissioning. 4680 production supports the Cybercab and Semi ramps and is not tied to the California order's packs.

  4. [4]
    Q3 2026 Update

    Tesla, Inc.officialPublished 21 Oct 2026Read directly 22 Nov 2026

    Read 2026-11-22. Shareholder update for the call on 21 October 2026. Volume production of the Semi has begun in Nevada. The top variant is given as 500 miles at a full 82,000 lb gross combination weight and 1.7 kWh per mile. Those are range and efficiency, not pack energy. Megafactory Texas began production with a planned 50 GWh. The first Megapacks built with LFP cells from Tesla's Nevada factory have shipped, and the battery section says those Megapacks are comprised solely of Tesla's own LFP cells. The cell table lists Nevada LFP at 7 GWh early ramp, Texas 4680 at more than 40 GWh in production, and Berlin 4680 as construction. It does not name a Megapack generation, a cell format or a pack energy.