Tesla Battery Atlas

Tesla Semi 4680 · Generation 1

Tesla Semi (2026 ramp)

The 2026 production ramp only. Tesla says 4680 output supports it, and the Q3 update says volume production has begun. A California order lists two capacities without a cell format, so those figures are separate packs. The top variant's 500 miles and 1.7 kWh per mile are range and efficiency, not pack energy.

Undisclosed4680 cylindrical2026 – present
Gross capacity
Unknown
Usable capacity
Unknown
Cells
Unknown
Pack mass
Unknown

2 of 2 values verified

Pack · top view

Module layout unverified

Cell supplier
Tesla, Inc.
Cell
Unknown
Vehicles
Semi
Built at
Not documented

About this pack

Tesla's Q2 2026 shareholder update says the company is increasing 4680 cell production to support the Tesla Semi production ramp, at a new factory in Nevada that was still commissioning for the 22 July 2026 call. The Q3 2026 update says volume production has begun on the high-volume line in Nevada, and that the top variant can go 500 miles at a full 82,000 lb gross combination weight at 1.7 kWh per mile. Those are range and efficiency. Neither update states pack energy, cell count, chemistry, mass or voltage, and the 500-mile sentence is not assigned to the California order's two packs.

California Executive Order A-374-0095 lists a 2026 Long Range pack at 822.029 kWh and a Standard Range pack at 548.019 kWh, both called Li-Ion (NCMA). The order does not say 4680, so those figures are not stored on this record.

This record is not the trucks covered by the rescue sheet from 2022. Those stay on the separate Semi pack, which has no cell format.

Specifications

Pack data, value by value

  • Manufacturer-confirmed
  • Documented
  • Community-reported
  • Estimated
  • Verified
  • Partly verified
  • Unverified
  • Contradicted

Every value shows its evidence level, whether we have checked it against a source we read directly, and its sources. “Unknown” means no source we trust has published it. We never fill gaps with assumptions.

Gross capacityTotal energy incl. bottom buffer
Unknown
Usable capacityEnergy available 100% → 0%
Unknown
Chemistry
Unknown
Cell format
4680[1]

Scoped to the 2026 production ramp only. The rescue sheet for trucks from 2022 does not state a cell format.

Cell supplier
Tesla, Inc.[1]

The Q2 2026 update says Tesla is increasing its own 4680 production to support the Semi ramp. It does not name a second supplier, and it does not say the trucks already covered by the 2022 rescue sheet use these cells.

Cell count
Unknown
ConfigurationSeries × parallel
Unknown
Modules
Unknown
Nominal voltage
Unknown
Architecture
Unknown
Pack mass
Unknown
Energy densityPack level
Unknown

Requires both pack mass and capacity.

Structural pack
Unknown
Peak DC charging
Unknown

The cell

Unknown

No source read for this pack identifies the cell format, dimensions or capacity. A series/parallel layout is listed under specifications only when a source states one.

Capacity in context

Gross capacity of every documented pack. Hatched bars are disputed ranges; packs with unknown capacity are omitted.

  1. Cybertruck 4680123
  2. Model S/X 100103
  3. Model S/X 2021+100
  4. Model S/X 9090
  5. LG 5N88.2
  6. Model S 8585
  7. LG 5M84.7
  8. Panasonic 3L82.1
  9. Roadster 3.0 (R80)80
  10. Tesla 8L79
  11. LG 5L78.8
  12. Panasonic 377.8
  13. Model S/X 7575
  14. LG 5C74.5
  15. Panasonic 72 kWh72
  16. Model S 7070
  17. Tesla 4680 Structural (Model Y)69
  18. CATL 6M62.5
  19. Model 3 Mid Range62
  20. Model S 6060
  21. CATL 6L60
  22. BYD 7C55–60 (disputed)
  23. CATL 6C55
  24. Panasonic 1L55
  25. Model 3 Standard Range54
  26. Roadster ESS53
  27. Panasonic 1C52.5
  28. Powerwall 214

Applications

Where this pack is installed

Each row is a documented link between this pack and a vehicle variant, with its factory, period and evidence. A variant may also appear with other packs.

VariantPeriodFactoryMarketCodeEvidence & check
2026 production rampSemi (2022–)2026 – end not documentedNot documentedNot market-specific—
[1]

2026 production ramp only. The update says the new Nevada factory was still commissioning on 22 July 2026 and does not give a street address, so no plant is pinned. Not the trucks covered by the 2022 rescue sheet.

Performance

Charging, advantages and tradeoffs

Peak DC charging

Unknown

No verified charging curve for this pack is in the database yet. Curves vary with temperature, state of charge and software, so we only publish curves backed by repeatable measurements.

Advantages

None documented with a source yet.

Tradeoffs

None documented with a source yet.

Identification

How to tell if your car has it

  • Q2 2026 update only. Not the 2022 rescue-sheet trucks. The California order's two capacities are separate packs.
  • The part number on the high-voltage battery label and Tesla service records are definitive. A VIN alone does not encode the cell supplier or pack code.

History

Lineage in the Tesla Semi 4680 family

Tesla's Q2 2026 update says 4680 production supports the Semi production ramp. It does not say the trucks covered by the rescue sheet since 2022 use those cells, and it does not publish pack energy.

  1. Tesla Semi (2026 ramp)2026–now · Unknown
  1. [2]

    Semi volume production begins

    Tesla's Q3 2026 update says volume production of the Semi has begun on the high-volume line in Nevada. The top variant can go 500 miles at a full 82,000 lb gross combination weight at 1.7 kWh per mile. Those are range and efficiency. The update does not state pack energy or the day production began.

Sources

3 references

  1. [1]
    Q2 2026 Update

    Tesla, Inc.officialPublished 22 Jul 2026Read directly 24 Nov 2026

    Re-read 2026-11-24. Shareholder update for the 22 July 2026 call. "Powerwall 3P (three-phase) is now available in Germany" and the sentence does not state an energy. Megapack 3 and Megablock were "on track to begin production" in 2026 at Megafactory Texas. The capacity table lists Nevada Tesla Semi as commissioning. 4680 production supports the Cybercab and Semi ramps and is not tied to the California order's packs.

  2. [2]
    Q3 2026 Update

    Tesla, Inc.officialPublished 21 Oct 2026Read directly 22 Nov 2026

    Read 2026-11-22. Shareholder update for the call on 21 October 2026. Volume production of the Semi has begun in Nevada. The top variant is given as 500 miles at a full 82,000 lb gross combination weight and 1.7 kWh per mile. Those are range and efficiency, not pack energy. Megafactory Texas began production with a planned 50 GWh. The first Megapacks built with LFP cells from Tesla's Nevada factory have shipped, and the battery section says those Megapacks are comprised solely of Tesla's own LFP cells. The cell table lists Nevada LFP at 7 GWh early ramp, Texas 4680 at more than 40 GWh in production, and Berlin 4680 as construction. It does not name a Megapack generation, a cell format or a pack energy.

  3. [3]
    Executive Order A-374-0095, Tesla heavy-duty zero-emission powertrains

    California Air Resources BoardregulatoryPublished 9 Apr 2026Read directly 22 Nov 2026

    Read 2026-11-14. Model year 2026, family TTSL4ELCPSHD, attachment dated 9 April 2026. Long Range: Li-Ion (NCMA), usable 822.029 kWh, rated 822.029 kWh, motor peak and steady power 800 kW. Standard Range: Li-Ion (NCMA), usable 548.019 kWh, rated 548.019 kWh, motor 525 kW. The order does not name a cell format, a cell count, a mass or a factory.